Maybe This Time: Sheppard Subway Extension Gets Another Shot
After years of debate and delays, Toronto’s much-needed Line 4 Sheppard subway extension could inch closer to reality in 2024. Metrolinx, the regional transit agency, is finally gathering public feedback on potential routes, offering a glimmer of hope that this time, it might actually happen.
A History of Frustration
The Sheppard subway’s story is one of frustration. Originally envisioned as a major east-west artery, budget cuts forced it into a stubby 5.5 km line with only five stations, opening in 2002. Critics dubbed it a “stubway” for its limited reach and low ridership. Over the years, extension proposals bounced around like rush hour streetcars, but none ever reached the final stop. A 2019 eastward extension promise came with no funding or timeline, leaving residents skeptical.
A Chance for Connection
But here in 2024, there’s a renewed sense of possibility. Metrolinx is actively seeking public input, suggesting they’re serious about making this happen. Imagine the possibilities: new links to Line 1 and 2, connections to GO Transit lines, and a finally-connected east-west route across the north of the city. This could be a game-changer for residents and businesses along the Sheppard corridor.
The Maybe Factor
Of course, there’s always a “maybe” factor with infrastructure projects. Will public feedback be heeded? Will funding materialize? Will construction actually start in our lifetimes? These are valid questions. But for the first time in a long time, there’s a reason to be cautiously optimistic. Metrolinx is moving forward, and with strong public support, the Sheppard subway extension might finally become more than just a dream.
What are the four options being considered for the Sheppard subway extension?
Metrolinx is currently considering four potential options for extending the Sheppard subway (Line 4):
- Extending the subway westward from Sheppard-Yonge Station to Sheppard West Station, connecting with Line 1.
- Extending the subway eastward from Don Mills Station to Sheppard-McCowan, connecting with the proposed Scarborough Subway Extension of Line 2.
- A connection to Line 2, via direct to Scarborough Town Centre.
- A combination of both westward and eastward extensions.
- A further extension, past Line 2 to Morningside. However I would be surprised if this happened, with the Eglinton – Marlven LRT in play.
Metrolinx is gathering public feedback on these options as part of developing an initial business case for the Sheppard Extension project. The goal is to improve transit connections and east-west travel in Toronto’s northern suburbs by potentially linking Line 4 to Lines 1 and 2, as well as GO Transit lines in the area.
Archives Articles: